EST. 1992

PROFESSIONAL INSTALLATION

QUALITY FIRST

Heating System

Boiler

Special Steel Material Tank Body - It's Durable!

The body of the boiler and pipe are all STBJ (JIS3461) material. The particular design of smoke path causing higher heat transfer efficiency and reduce the scale.

Only 3-5 minutes, it can produce steam

Only 3-5 minutes requested and it can reach set pressure. Not only time saving but also fule of heating saving.


Adopt with a separate burner

It is convenience on maintenance and disassemble without any hand tools because of the design of the separate burner.


Strict safety device and safety control

A safety device control burning, steam pressure, and water level. It also has an auto diagnostic capability to detect where is broken without a professional person.


Steam and water separator are pre-installed. It can cause an excellent steam quality and dry degree of steam.


鍋爐系統